Implication of Interarea Transactions with B7Flat System
This is a team exercise using PowerWorld
Simulator. You will use the simulation cases already provided with the
software. Teams should have two to three students
- Perform and evaluate a 50MW transaction between the Left and
Right Areas by doing the following: determine the buy and sell
quotes for the transaction, and using the split-the-savings rule
(that is, the rule that says that the price of transaction is
halfway between the buy and sell quotes) determine the change in
total costs in the two areas as a result of the transaction.
Determine the effect of the transaction on the Top Area by
determining the change in cost and losses as a result of the
transaction.
- Determine everything listed for the first part for an additional
50MW transaction. In this case, there will be a transmission line
overload in the Top Area. Take the Top Area off of economic
dispatch and find a reallocation of generation that eliminates the
overload before you determine the change in costs and losses. Be
sure to keep ACE equal to zero. Describe how you re-allocated the
generation outputs to solve the congestion problem.
Thanks to Dennis Ray of UW-Madison for this problem.
|